The cost consultant will provide a cost estimate based on the design, materials and finishes approved by the client.
 
If the estimate provided by the consultants is above the ceiling limit of the client’s budget, materials and finishes may require to be altered, and the design may need to be revisited.
 
Tender documents will be provided by the cost consultants.